Legacy Parkway Design-Build
Overview:
The Legacy Parkway Design-Build project was a landmark transportation investment that created a new limited-access highway corridor in the Greater Salt Lake Valley. Constructed northwest of Salt Lake City, the project improved regional mobility, reduced congestion on existing roadways, and established a critical transportation link for one of Utah’s fastest-growing regions. Kraemer participated as part of a joint venture, leading the design and construction of bridge structures throughout the corridor and helping deliver one of UDOT’s most significant transportation projects of its time.
Project Overview:
This $312 million design-build project constructed nearly 14 miles of new four-lane divided highway through the Greater Salt Lake Valley. The corridor included extensive bridge construction, roadway infrastructure, earthwork, and community enhancements designed to support long-term regional growth. As part of the joint venture team, Kraemer managed the design and construction of the project’s bridge program, delivering innovative structural solutions across challenging soil conditions. The project also marked the beginning of Kraemer’s long-standing relationship with the Utah Department of Transportation, paving the way for future collaboration on several major transportation initiatives throughout the state.
Key Infrastructure Improvements:
- Construction of approximately 14 miles of new four-lane limited-access highway northwest of Salt Lake City
- Design and construction of 26 bridge structures, including seven steel girder bridges, 17 precast concrete girder bridges, and two post-tensioned flat slab bridges
- Construction of approximately 690,000 square feet of bridge deck across the corridor
- Installation of 343,000 linear feet of piling to support structures in the Salt Lake Valley’s soft soil conditions
- Placement of approximately 3 million square yards of concrete pavement
- Completion of more than 7 million cubic yards of excavation and earthwork
- Construction of noise walls and noise berms to reduce impacts on adjacent communities
- Development of park-and-ride facilities to support regional transportation connectivity
Project Timeline and Performance:
The Legacy Parkway Design-Build project was successfully completed ahead of schedule, demonstrating the effectiveness of the design-build delivery method and the project’s collaborative team approach. Project duration September 2001 to December 2004. The scheduling, construction management, and delivery strategies implemented on Legacy Parkway became a model for subsequent Kraemer design-build projects and helped shape the firm’s approach to large-scale transportation infrastructure programs across the country.
Community Impact:
Legacy Parkway provided a critical new transportation corridor that improved mobility throughout the Greater Salt Lake Valley while incorporating features designed to minimize impacts on surrounding communities. Noise mitigation measures, park-and-ride facilities, and thoughtful corridor planning helped balance transportation needs with community considerations. The project’s infrastructure improvements continue to support regional growth and economic development while enhancing travel efficiency throughout northern Utah.
Project Significance:
The Legacy Parkway Design-Build project was one of Kraemer’s early large-scale design-build successes and remains a milestone in the company’s transportation portfolio. The project established Kraemer’s presence in the Utah market and laid the foundation for a decade-long partnership with UDOT that included major projects such as the Bangerter Interchange Design-Build and Bangerter 4 Interchanges Design-Build programs. Lessons learned from Legacy Parkway were subsequently applied to other award-winning design-build projects, helping advance innovative project delivery practices throughout Kraemer’s transportation operations.