TH 212 Design-Build
Overview:
The MnDOT TH 212 Design-Build project was a major transportation corridor expansion that extended a controlled-access freeway through the rapidly growing communities of Eden Prairie, Chanhassen, and Chaska, Minnesota. Delivered through the Kraemer-Ames Joint Venture, the project improved regional mobility, enhanced safety, and supported future growth while incorporating innovative design solutions, environmental stewardship, and significant cost-saving measures.
Project Overview:
This $244 million design-build project constructed approximately 12 miles of new four-lane controlled-access freeway in Hennepin and Carver Counties. The project included the construction of 28 bridges, seven interchanges, park-and-ride facilities, extensive retaining and sound walls, and advanced stormwater management systems. As one of Minnesota’s largest highway design-build projects at the time, the corridor incorporated more than 23 innovations and value engineering initiatives that improved efficiency and generated substantial cost savings for MnDOT.
Key Infrastructure Improvements:
- Construction of approximately 12 miles of new four-lane controlled-access highway from Eden Prairie to Chaska
- Design and construction of 28 bridges, including multiple-span prestressed concrete structures crossing local roads, waterways, and transportation corridors
- Construction of seven full interchanges and five overpass bridges along the corridor
- Installation of approximately 50,000 square feet of retaining walls and more than 185,000 square feet of noise and sound walls
- Design and construction of more than 30 water quality ponds and associated stormwater management systems
- Development of wetland mitigation areas and environmental protection measures within seven environmentally sensitive areas
- Construction of park-and-ride facilities to support regional transit connectivity
- Incorporation of significant aesthetic enhancements throughout the corridor
- Installation of Intelligent Transportation Systems (ITS) infrastructure and coordination of extensive utility relocations
Project Timeline and Performance:
The project was constructed between May 2005 and September 2008 and successfully delivered a new regional freeway corridor serving some of Minnesota’s fastest-growing communities. Throughout construction, the project team maintained strict environmental compliance while working within seven environmentally sensitive areas and coordinating with multiple watershed districts. The project also achieved an outstanding safety milestone of 1 million man-hours without a lost-time accident, demonstrating the team’s commitment to safe project delivery.
Innovation and Value Engineering:
Innovation played a central role in the success of the TH 212 Design-Build project. Four bridge-related Value Engineering Proposals were accepted by MnDOT, generating approximately $4 million in cost savings. In total, more than 23 innovative solutions were incorporated into the project, improving constructability, reducing costs, enhancing long-term performance, and maximizing value for MnDOT and the traveling public.
Community and Environmental Impact:
The new TH 212 corridor significantly improved regional transportation connectivity while supporting continued residential and commercial growth in the southwest Twin Cities metropolitan area. The project balanced mobility improvements with environmental stewardship through advanced stormwater treatment systems, wetland mitigation efforts, and extensive coordination with regulatory agencies. New park-and-ride facilities, noise walls, and aesthetic enhancements further improved the corridor’s value to surrounding communities.
Project Recognition:
The MnDOT TH 212 Design-Build project received the 2006 Storm Water Management Innovation Award from the Resource Professionals Alliance for its innovative stormwater management practices and environmental design. The project also earned the 2007 AASHTO Value Engineering Award in recognition of the team’s successful value engineering initiatives, including four bridge-related proposals that delivered significant cost savings while maintaining project quality and performance standards.