Totem Lake Connector
Overview
Kraemer North America served as the prime contractor for the Totem Lake Connector Pedestrian & Bicycle Bridge, a 795-foot-long structure that safely connects the Cross Kirkland Corridor across one of the busiest and most complex intersections in Kirkland, Washington. This $13.6-million project created a grade-separated crossing over Totem Lake Boulevard and NE 124th Street, improving safety, mobility, and connectivity within the City’s rapidly growing urban center.
The project included construction of five steel truss spans, including two erected over active traffic, along with six additional spans forming a northern loop ramp over environmentally sensitive wetlands. The bridge features a 14-foot-wide deck, widened overlook areas, and gradual approach grades designed to accommodate pedestrians and cyclists while maintaining accessibility and minimizing impacts to the surrounding infrastructure.
Construction took place in a highly constrained urban environment surrounded by active commercial development, heavy traffic, existing utilities, and protected wetlands. Kraemer coordinated closely with the City of Kirkland, utility providers, and project partners to maintain access to adjacent properties, protect critical infrastructure, and keep traffic moving throughout all phases of construction. The team worked around multiple overhead transmission lines, existing drainage systems, buried utilities, and a major Northshore Utility District sewer line that remained in service during construction.
To reduce environmental impacts, the bridge foundations within the wetland area were constructed using drilled shafts supporting steel Y-piers, minimizing the footprint of the structure and allowing for restoration planting beneath the bridge. Lightweight structural components and carefully sequenced erection activities were used to address poor soil conditions in the loop ramp area, which required additional consideration for seismic performance and ground stability.
Sustainability features were incorporated throughout the project, including vegetated mechanically stabilized earth (MSE) retaining walls, porous asphalt paving on the approaches, and stormwater infiltration systems located beneath the bridge spans. These elements helped reduce runoff, improve drainage, and better integrate the structure with the surrounding environment.
Due to the length and geometry of the loop ramp, maintaining user comfort on the slender structure required specialized solutions during construction. Tuned vibration dampers were installed at overlook locations to control pedestrian-induced movement, an uncommon feature for transportation structures but critical for long-term performance.
The Totem Lake Connector is a key component of Kirkland’s long-term transportation and redevelopment strategy, providing a safe and reliable connection across a previously difficult intersection and supporting future growth in the Totem Lake urban center. Kraemer’s work on this project demonstrates the team’s ability to deliver complex bridge construction in tight urban conditions while maintaining safety, quality, and environmental responsibility.