US 85 Corridor Improvements

Overview

The US 85 Corridor Improvements project, officially known as the “US 85 Widening (Highlands Ranch Parkway to Dad Clark Gulch),” is a comprehensive reconstruction project that transformed a congested, outdated three-mile stretch of US 85 in Douglas County, Colorado into a modern highway with continuous flow intersections.

 

Project Overview:
This $108 million project widened 2.5 miles of US 85 from four to six lanes (expanding to eight with auxiliary lanes) between Highlands Ranch Parkway and Dad Clark Gulch. The scope included major improvements at six intersections, implementation of continuous flow intersections at Town Center Drive and Highlands Ranch Parkway, and replacement and widening of the existing US 85 bridge over C-470 with pedestrian and bicycle connections.

 

Key Infrastructure Improvements:

  • Widening from four to six lanes with auxiliary lanes for a total of eight lanes
  • Construction of continuous flow intersections (CFIs) to improve traffic flow
  • Replacement of at-grade bikeway crossings with concrete box culvert (CBC) underpasses
  • Construction of a new shared-use path for bicycles and pedestrians
  • Installation of drainage systems, waterlines, and joint utility trenches
  • Addition of bus stop shelters and ADA-compliant infrastructure
  • Major utility relocations coordinated through joint utility trenches

 

Project Timeline and Performance:
The project ran from September 2022 to June 2025 (2 years 9 months) and was completed three months ahead of schedule. Despite significant utility relocation delays and unplanned conflicts, Kraemer successfully resequenced construction phasing and redesigned elements to achieve early completion.

Community Impact:
The project included extensive public and business outreach strategies to minimize impacts during construction. Construction was phased to maintain traffic flow and business access throughout the corridor. The improvements delivered enhanced traffic capacity, safety features, and modern infrastructure while addressing longstanding congestion issues in this heavily traveled corridor.